Collingwood Heating - Talk Now Collingwood Heating - Live Help Collingwood Heating - Request a Quote
Collingwood Heating - Logo
Collingwood Heating - Main 3
Projects

Lighthouse Point (1997-2007)

Clarksburg Contractors provided electrical, plumbing, heating, and air conditioning equipment for 230 condominium units.

Image - 1 Image - 2 Image - 3 Image - 4 Image - 5 Image - 6 Image - 7 Image - 8 Image - 9 Image - 10 Image - 11 Image - 12 Image - 13 Image - 14 Image - 15 Image - 16 Image - 17 Image - 18

Collingwood Toyota (2005-2006)

Clarksburg Contractors worked in close conjunction with owners Dean Lockhart and Krista Walcroft and general contractor DBD Systems to provide mechanical and electrical facilities

Image - 1

VOA Canada (2000-present)

International seatbelt manufacturer, Collingwood plant. Clarksburg Contractors installed webbing machines, dye range and Makup air equipment, and provides ongoing maintenance service to these installations.

Image - 1 Image - 2 Image - 3 Image - 4

Beaver Valley Ski Club

New maintenance shop / 2008-2009 design build6000 sq. ft. building, under floor heating from high efficiency gas boiler. All plumbing, electrical, HVAC. Offices heating and cooling Lennox furnace and air conditioner. DBD systems building contractor

Image - 1

Craigleith Ski Club

Renovations to office area in south lodge 2009. Installation of Lennox high efficiency gas furnace and air conditioner combined with heat recovery ventilator. Two Lennox duct furnaces for Lodge

Image - 1

The Town of the Blue Mountains

Parks and Recreation maintenance building design build 2009 All plumbing, electrical and HVAC services Under floor heat supplied by two 5-ton Water Furnace Geo Thermal Units

Image - 1

Staples Collingwood

Image - 1

Collus Collingwood Utility Services

Image - 1

Lighthouse Marina

Image - 1

Collingwood Heating - Bottom 1
Collingwood Heating - Bottom 1
Collingwood Heating - Bottom 1